Projects
![Traffic Engineering, Truck Movements and Internal Road Design.jpg](https://static.wixstatic.com/media/025986_4e9a8dd3e897478d9bd2fa429fc68fde~mv2.jpg/v1/fill/w_403,h_303,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Traffic%20Engineering%2C%20Truck%20Movements%20and%20Internal%20Road%20Design.jpg)
Project: Woolworths National & Regional Distribution Centre, Moorebank
Client: Richard Crookes Constructions
Year Completed: 2024
Deliverables: Heavy Vehicle Access Design, Parking, Vehicle Circulation and Certification.
Headway Traffic and Transport was engaged by Richard Crookes Constructions to provide traffic engineering services at various stages of construction of Woolworths Regional and National Distribution Centres. From circulation and parking design assessment, preparation of signage & line marking plans, to issuing traffic engineering occupation certificate, Headway Traffic and Transport assisted the builder in ensuring that the facility will be provided with safe and accessible parking and pedestrian facilities.
![Traffic Impact Study - Taronga Western Plains Zoo.jpg](https://static.wixstatic.com/media/025986_af0f9d06a932412ab49fc584c1e67bae~mv2.jpg/v1/fill/w_251,h_334,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Traffic%20Impact%20Study%20-%20Taronga%20Western%20Plains%20Zoo.jpg)
Project: Taronga Western Plains Zoo, Dubbo
Client: Taronga Conservation Society Australia
Year Completed: 2024
Deliverables: Traffic Impact Assessment and Modelling
Headway Traffic and Transport was engaged by Taronga Conservation Society Australia to develop a Traffic Impact Assessment that determines the traffic and transport impacts associated with the development of Taronga Western Plains Zoo. Headway Traffic and Transport assessed the potential traffic impacts of the proposed development to the surrounding intersections via SIDRA modelling and verified that the impacts are considered acceptable. Headway Traffic and Transport provided advice on access road design, internal road circulation, and provision of basic right turn and left turn treatments to the access road.
![Transport Impact Assessment and Road Safety Audit - Cremorne.jpg](https://static.wixstatic.com/media/025986_a01f8348ceed46e593cf64e5a3a8645f~mv2.jpg/v1/fill/w_251,h_334,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Transport%20Impact%20Assessment%20and%20Road%20Safety%20Audit%20-%20Cremorne.jpg)
Project: Grosvenor Lane, Neutral Bay – Traffic Modelling and Traffic Impact Assessment
Client: North Sydney Council
Year Completed: 2024
Deliverables: Traffic Impact Assessment and Traffic Modelling
Headway Traffic and Transport was engaged by North Sydney Council to undertake traffic modelling and prepare a Traffic Impact Assessment of three options for a proposal to change the traffic configuration along Grosvenor Lane between Ben Boyd Road and Young Street in Neutral Bay, NSW. We extensively assessed the current and potential traffic conditions of the proposed traffic configuration alternatives in the study area. This included SIDRA modelling and Swept Path Feasibility Assessment. This has helped Council to determine future actions to resolve community safety and transport concerns.
![Transport Impact Study - Subdivision.png](https://static.wixstatic.com/media/025986_072de2ba42c444b3913c1d3cefafc211~mv2.png/v1/fill/w_332,h_334,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Transport%20Impact%20Study%20-%20Subdivision.png)
Project: Elizabeth Avenue, Forest Hill - Land Subdivision
Client: SIVA Projects
Year Completed: 2024
Deliverables: Traffic Impact Assessment and Access Review
Headway Traffic and Transport was engaged by SIVA Projects to develop a Traffic Impact Assessment to determine the traffic and transport impacts associated with the 100 lot subdivision of 1 Elizabeth Avenue, Forest Hill. We assessed the potential traffic impacts of the proposed subdivision via SIDRA modelling and verified that the impacts are acceptable. The internal roads and access arrangements were verified to be consistent with the requirements of Council DCP.
![Philter Brewing Green Travel Plan.png](https://static.wixstatic.com/media/025986_0ebf79e0029f4046a81a19a60d3c951d~mv2.png/v1/fill/w_402,h_334,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Philter%20Brewing%20Green%20Travel%20Plan.png)
Project: Sydenham Road, Marrickville
Client: Philter Brewing
Year Completed: 2023
Deliverables: Green Travel Plan
Headway Traffic and Transport was engaged by Philter Brewing to prepare a Green Travel Plan to provide its employees sustainable transport alternatives due to limited off-street parking and to minimise the impacts associated with private vehicle movements. In consideration of Philter Brewing employees’ residence and willingness to consider sustainable transport, we identified specific objectives and targets for the Green Travel Plan. Since initial issuance of the Green Travel Plan there have been positive outcomes achieved including reduction of private vehicle use and increase in walking and cycling.
![Mogo Public School Parking Study.jpg](https://static.wixstatic.com/media/025986_8fddc609e4de4eeeb98e890d732cc393~mv2.jpg/v1/fill/w_403,h_227,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Mogo%20Public%20School%20Parking%20Study.jpg)
Project: Mogo Public School Parking
Client: NSW Department of Education
Year Completed: 2020
Deliverables: Parking Feasibility Study Mogo Public School, Mogo.
After the bushfires that devastated the community of Mogo in early 2020, Headway Traffic and Transport was engaged by the Department of Education and Training to develop a car park feasibility study, providing off -street parking for the local public school. With the existing access requiring schoolchildren to cross the Princes Highway, the project identified two suitable designs to improve access for students, teachers and parents.
![Mosman Bay Trailer Parking Study.jpg](https://static.wixstatic.com/media/025986_e48f79d21bb747b48df46234f2ed00a5~mv2.jpg/v1/fill/w_403,h_302,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Mosman%20Bay%20Trailer%20Parking%20Study.jpg)
Project: Mosman Council Trailer Parking Review
Client: Mosman Council
Year Completed: 2022
Deliverables: Data Collection, Trailer Parking Study and Policy Review
Headway Traffic and Transport provided a boat trailer parking management strategy in Mosman Local Government Area to solve the increasing customer requests, complaints and investigations related to boat trailer placement. The management strategy has provided safe parking, reduced customer complaints and efficient customer communication system by permitting residents to park trailers in front of their own property, provision of trailer parking areas, and implementation of a digital trailer parking permit. This strategy has identified and provided the opportunities to improve the management of parking and has satisfied both trailer owning and non-trailer owning residents and visitors.
![Depena Reserve Parking and Pedestrian Design.png](https://static.wixstatic.com/media/025986_89f49150bf454486883034fad5c024f5~mv2.png/v1/fill/w_403,h_324,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Depena%20Reserve%20Parking%20and%20Pedestrian%20Design.png)
Project: Depena Carpark, Depena Reserve, Dolls Point
Client: Shakeup Architecture/Bayside Council
Year Completed: Ongoing
Deliverables: Parking Design, Speed Management, Road Safety and general traffic engineering advice.
Headway Traffic and Transport supported the client in the development of Depena Carpark through various consultations, design review, and provision of traffic engineering design plans. We ensured that the design of the carpark complies with relevant standards and provides safe and efficient pick-up and drop-off for the adjacent school. Furthermore, we were able to assist the client in addressing resident concerns on access arrangements and reported incidents of speeding and hooning.
![Road Safety Audit - Pre Opening Dubbo Facility.png](https://static.wixstatic.com/media/025986_3939bba629754875a0c4c30c184bb2e3~mv2.png/v1/fill/w_403,h_224,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Road%20Safety%20Audit%20-%20Pre%20Opening%20Dubbo%20Facility.png)
Project: Regional Rail Dubbo Maintenance Facility, Dubbo
Client: CPB Contractors
Year Completed: 2024
Deliverable: Road Safety Audit Pre-Opening
Headway Traffic and Transport completed a Pre-Opening Road Safety Audit for the Regional Rail Dubbo Maintenance Facility in Dubbo. The audit was focused on pedestrian safety at footpaths and various crossing points from the access road to the internal roads. The audit team was able to identify hazards and risks for the client’s consideration in their pursuit of pedestrian safety when the facility starts operating.
![Road Safety Audit - Pre Opening Metro.jpg](https://static.wixstatic.com/media/025986_3227d47ce95f42138e30579033be57d8~mv2.jpg/v1/fill/w_403,h_188,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Road%20Safety%20Audit%20-%20Pre%20Opening%20Metro.jpg)
Project: Sydney Metro – Chatswood Dive Site, Chatswood
Client: Sydney Metro
Year Completed: 2024
Deliverable: Road Safety Audit Pre-Opening
Headway Traffic and Transport completed a Pre-Opening Road Safety Audit for the Sydney Metro Chatswood Dive Site access road and associated facilities. The access road would provide a new connection between Nelson Street and Mowbray Road complete with pedestrian and cyclist facilities. The audit team was able to identify hazards and risks concerning pedestrian, cyclists and motor vehicle users’ safety.
![Road Safety Audit - Design.jpg](https://static.wixstatic.com/media/025986_bf33eae5cde44915ac39f06bf8ac7501~mv2.jpg/v1/fill/w_403,h_302,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Road%20Safety%20Audit%20-%20Design.jpg)
Project: 100 Bayswater Road, Rushcutters Bay
Client: Richard Crookes Constructions
Year Completed: 2024
Deliverable: Road Safety Audit Design Roadworks and Ultimate Intersection Design
Headway Traffic and Transport completed Pre-Construction and Detailed Design Road Safety Audits associated with incorporating the access driveway of the development to the traffic signals of Bayswater Road - McLachlan Avenue intersection. Separate audits were conducted on the traffic control signals design and the related traffic guidance scheme. The audit team was able to provide the client with list of risks and treatment options concerning sight limitations and the proposed delineation during construction.
![Traffic Staging PLans and Road Safety Audit.jpg](https://static.wixstatic.com/media/025986_3c20848170f74201b5fe8e215499cd10~mv2.jpg/v1/fill/w_403,h_188,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Traffic%20Staging%20PLans%20and%20Road%20Safety%20Audit.jpg)
Project: Turella Station, Turella
Client: Downer
Year Completed: 2024
Deliverable: Road Safety Audit Roadworks
Headway Traffic and Transport completed multiple roadwork stage Road Safety Audits for the implementation of the traffic management plan associated with Turrella Train Station upgrade project. The traffic management plan consisted of pedestrian detour and changes to lane alignments at Reede Street adjacent to the station. The pedestrian detour has been identified by the audit team to have created additional risks to pedestrian safety while the changes in the alignment resulted to risks concerning driver and vulnerable road user safety. The audit team provided the client treatment options which helped the client in minimising the identified risks.